DESCRIPTION MAJOR QUANTITIES OF WORKS:
- Concrete : 53,000 m3
- Building : 4,370 m2
- Piping Fabrication & Erection : 343,000 inch-Dia
- Equipment Erection : 14,750 tons
- Electrical Work : 284 Cabling(km)
- Instruments : 270 Cabling(km)
- Painting : 54,000 m2
- Steel Structure Erection : 10,700 tons
- sulation : 50,000 m2
Execution of Civil, Building, Piping, Equipment erection,Steel structure,Electrical, Instrumentation,Paving, Insulation, and Precommissioning works